33
9 Control System and Programs 9
9.2 Program Sequence 9.2
Machine P 25/P30 P 00 P 01 P 02 P 03 P 04 P 05 P 06 P 07 P 08 P 09
Pump tank 1 to tank 1 00:05 00:05 00:05 00:05 00:05
Pumping up from tank 1 00:55 00:55 00:55
Pumping up from tank 2 00:30 00:25 00:30 00:55
Pump circuit 02:00 02:00 02:00 02:00
Spinning to distillation. 01:30 01:30 01:30
Pumping up from tank 1 01:30 01:30 01:30 01:10 01:30
Pumping up from tank 2 01:00 01:00 01:30 01:30 01:30* 01:30 00:30* 01:00*
Filtration 05:00 05:00 05:00 05:00 03:00 05:00 05:00
Pump circuit 03:00* 03:00* 03:00* 03:00* 03:00* 02:00
Pumping to tank 1 00:45 00:45 00:45 00:30 00:45
Pumping to tank 2
Pumping out to distill. 00:45 00:45 00:30
Spinning to tank 1 02:30 02:30 02:00 02:30
Spinning to tank 2
Spinning to distillation. 02:30 01:00 01:30 02:00 02:00
Pumping to tank 1 00:45 00:45 00:45
Pumping to tank 2
Pumping out to distill. 00:45 00:45 00:45
Pumping up from tank 2 01:30 00:45* 00:45
Pump circuit 02:00 03:00 03:00
Pumping to tank 2 00:30 00:15
Pumping out to distillation. 00:15
Spinning to tank 2 02:30 01:00
Spinning to distillation. 02:30
Pumping to tank 2 00:45 00:45
Pumping out to distill. 00:45
Tumbling 00:30
Spraying 04:00 04:00
Tumbling 03:30 03:30
Predrying without heat 03:00 03:00 03:00 03:00
Drying cage outlet 50°C
(122 °F)
12:00 12:00 12:00 12:00 12:00 12:00 14:00 14:00
Drying cage inlet: 60°C
(140 °F)
09:00 09:00
Drying time controller X X X X X X X X X X
Reduction** from
w/o Slimsorba to
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
02:00
06:00
Reduction with Slimsorba 03:00 03:00 03:00 03:00 03:00 03:00 03:00 03:00 03:00 03:00
Adsorption (only with
Slimsorba)
06:00 06:00 06:00 06:00 06:00 06:00 06:00 06:00 06:00 06:00
Total time from
(w/o controller) to
28:30
32:30
28:30
32:30
33:30
37:30
38:55
42:55
21:30
25:30
33:30
37:30
25:45
29:45
29:00
33:00
32:45
36:45
27:00
31:00
Total time with Slimsorba
(w/o controller)
35:30 35:30 40:30 45:55 28:30 40:30 32:45 36:00 39:45 34:00
* Dosing P04/P05: with solvent cooling = soft programs
** temp. controlled
X plus standstill times because of the drying controller
The times given in the table correspond to the program sequences at the time of printing.
We reserve the right to make any procedural changes to times and program sequences in the interest of technical progress.
P25/P30