EasyManua.ls Logo

BTECH S5 BATTERY VALIDATION SYSTEM SCM-600 - Page 50

BTECH S5 BATTERY VALIDATION SYSTEM SCM-600
58 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 S5 Battery Validation System
2(cont.)
b. A graphical representation of your battery
system will appear.
A green rectangle indicates on OK battery
cell.
An orange rectangle indicates a battery cell
that needs attention because its readings have
exceeded maintenance limits.
A red rectangle indicates a malfunctioning
battery cell, because its readings have
exceeded critical limits.
3
Pinpoint the
problem.
a. Double-click on any red or orange rectangle to see more information about the faulty battery
cell. A graph of the cell’s performance over time will be displayed. The red dotted line is critical
limits and the purple dotted line is maintenance limits.
b. Scroll over a point on the graph to see which unit is malfunctioning.
Action How to do it Picture

Related product manuals