20 S5 Battery Validation System
Step 1: Install
Connectors
In this step, you will place connectors for the VSLs (voltage sense leads) onto
your battery units.
...plus, for battery cells with terminal posts:
Items Needed
For all installations...
Qty Item Picture
1 Battery Wiring List See Appendix
1
High-voltage insulated torque
wrench (0 to 150 in-lbs)
1 Rubber insulating mat
1 for each
connector
1/4” male quick disconnect
ring terminals / tabs
(supplied)
Qty Item Picture
1 for each
connector
Extra-long bolts (if bolts on battery
do not have at least 3/8”
(9.525mm) space free to double-
nut
1 of either Lock or star washers (supplied)
1 for each
connector
Flat washers (supplied)
Lock washer
Star washer