EasyManua.ls Logo

BTECH S5 - Step 5: Add Operating Power; Items Needed; Procedure

BTECH S5
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 S5 Battery Validation System
Step 5: Add
Operating Power
Items Needed
Procedure
Qty Item Picture
1 per
SCM-600
IEC power cord for SCM-600
1 per
SCM-600
S5, 48 Volt Conversion Kit
(optional method)
1. Attach power cord to SCM-600 2. Plug into wall or UPS power supply
OR, use optional S5, 48 Volt Conversion Kit to power S5 from batteries, if appropriate...
1. Connect stainless steel clamps to bus bars. Red/white
wire on (+) bus and black/white wire on (-) bus.
2. Terminate opposite end of cables into 2-pin green plug.
Red/white wire into terminal hole marked (+), and black/
white wire into terminal hole marked (-). Insert plug into
ā€œ26-60V AC/DC 20W + INPUT - ā€œ port in back of SCM-600.
3. Insert fuses into fuseholders.

Related product manuals