28 S5 Battery Validation System
Procedure
1. See where to place each VM-24 (See Battery Map)
2. Leave about 4” space for
the cables
3. Shield yourself from
electrical shock
4. Install the mounting hardware, as shown in the Battery Map
5. Mount the VM-24 as shown in the Battery Map
13. Drawing of person
reading Installation
Diagram
The different brackets
allow you to mount the
VM-24 in different ways.
Stack modules
together with
stacking brackets.
Use the holes in the
universal mounting
bracket for tie-
wraps or screws.
USE ANY
MOUNTING
METHOD
Attach the module with mounting brackets.