EasyManua.ls Logo

BTECH S5 - Page 41

BTECH S5
63 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Manual 41
Installation Procedure
Procedure
NOTE: CT and CM-2 come as calibrated pairs. BE SURE SERIAL NUMBERS MATCH WHEN INSTALLING. Also, install the
CT in a location that is readily accessable (accessable easily and safely, even when batteries are on charge).
1. Protect yourself
2. Unclip the CT to separate in half. Place the CT around
the positive (+) cable; make both red dots face the positive
side of the UPS (uninterruptable power supply)
3. Run the cable to the
CM-2 mounted nearby
4. Prepare the CT cable 5. Wire the 5-pin CT plug 7. Insert plug in CM-2
Strip 1” from end
Strip 1/4” from end
red, shield, white, black

Related product manuals