EasyManua.ls Logo

Bunn ULTRA-2 - Operating Controls Overview; Main Power ON;OFF Switch; Left Side Controls (Auger & Ice); Right Side Controls (Auger & Ice)

Bunn ULTRA-2
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
OPERATING CONTROLS
There are five of these switches that will be used for the operation of the dispenser.
1. switch (upper left corner of the control pad)
This switch is the ON/OFF toggle switch which powers up the dispenser and the LCD display. When ON
the Date and Time toggle back and forth continously except during programming.
2. (bottom left corner)
This is used to turn the left side auger motor to AUGER ON, AUGER OFF or AUGER REFILL ON. (Refill
only applicable when installed)
3. (bottom left corner)
This is used to turn the left side ice control to OFF, ICE or CHILL.
4. (bottom right corner)
This is used to turn the right side auger motor AUGER ON, AUGER OFF or AUGER REFILL ON. (Refill only
applicable when installed)
5. (bottom right corner)
This is used to turn the right side ice control to OFF, ICE or CHILL.
1
2 3 4 5
32080.0001 021105

Other manuals for Bunn ULTRA-2

Related product manuals