BYK-Gardner GmbH Getting Started
spectro2guide 15 / 43
4 Getting Started
Please observe following notes when you put the instru-
ment into operation.
– Assemble the entire system, consisting of instru-
ment, docking station and software. Consult System
Diagram [}Page:16] for more information.
– Place the instrument in the docking station and al-
low it to charge fully. The docking station automati-
cally loads and calibrates the instrument. Consult
Docking Station [}Page:16] and Charging the Instru-
ment [}Page:18] for more information.
– Press the operate button in order to turn the instru-
ment on.
– Become familiar with the main menu for a quick
navigation. Consult Main Menu [}Page:19] for
more information.
– Press the displayed icons on the touch screen with
your finger or the stylus in order to navigate
through the menu and perform functions.
– Use the hand strap as protection against dropping
the instrument.
– Use the smart-chart software to tap the full poten-
tial of the instrument. Consult smart-chart Software
[}Page:17] for more information.