EasyManua.ls Logo

BYK spectro2guide - 4 Getting Started

BYK spectro2guide
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BYK-Gardner GmbH Getting Started
spectro2guide 15 / 43
4 Getting Started
Please observe following notes when you put the instru-
ment into operation.
Assemble the entire system, consisting of instru-
ment, docking station and software. Consult System
Diagram [}Page:16] for more information.
Place the instrument in the docking station and al-
low it to charge fully. The docking station automati-
cally loads and calibrates the instrument. Consult
Docking Station [}Page:16] and Charging the Instru-
ment [}Page:18] for more information.
Press the operate button in order to turn the instru-
ment on.
Become familiar with the main menu for a quick
navigation. Consult Main Menu [}Page:19] for
more information.
Press the displayed icons on the touch screen with
your finger or the stylus in order to navigate
through the menu and perform functions.
Use the hand strap as protection against dropping
the instrument.
Use the smart-chart software to tap the full poten-
tial of the instrument. Consult smart-chart Software
[}Page:17] for more information.

Related product manuals