3 12/2016 © CAME S.p.A. - The data and information reported in this installation manual are susceptible to change at any time and without obligation on CAME S.p.A. to notify users.
Date Notes
Signature
MAINTENANCE
Periodic maintenance
☞ Before doing any maintenance, cut off the power supply, to prevent any hazardous situations caused by accidentally activating the operator.
Periodic maintenance log kept by users (every six months)
Extraordinary maintenance
⚠
The following table is for logging any extraordinary maintenance jobs, repairs and improvements performed by specialized contractors.
Any extraordinary maintenance jobs must be done only by specialized technicians.
Extraordinary maintenance log
Fitter's stamp Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed ___________________________________________________________________________________________
_____________________________________________________________________________________________________
________________________________________________________________________________________
Fitter's stamp Name of operator
Job performed on (date)
Technician's signature
Requester's signature
Job performed ___________________________________________________________________________________________
_____________________________________________________________________________________________________
________________________________________________________________________________________