EasyManua.ls Logo

Carrier 09VE - 7 Location; Maximum Permitted Wind Speed; Floor Mounting

Carrier 09VE
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 - LOCATION
For structures with a "special" seismic risk, please consult us.
Before setting up the unit in its intended location, the installer must check the following points:
- The unit must be installed outdoors in an area protected from ooding. Ensure that all conditions have been taken into account 
(negative outdoor temperatures, corrosive atmosphere, altitude, etc.)
- The ground surface or structure must be level and strong enough to bear the unit's weight.
- Raise the unit if it is installed in a snowy area, in order to ensure a sufcient air intake height.
- At the design stage, check that the installation location is compatible with the unit's sound level.
- Protect the unit from sandstorms using the appropriate infrastructure.
- Waste from vegetation is a major factor contributing to the clogging of the coil; avoid installing the unit close to deciduous trees.
- Do not install the unit near hot air extraction duct outlets.
The installer must take all necessary precautions to limit the recycling of hot air and ensure a good air supply to the unit.
7.1 - Maximum permitted wind speed
Maximum permitted speed once the unit is secured to the oor: 100 Km/h
For speeds > 100 Km/h, contact us.
7.2 - Floor mounting
Fluid input side
Allow at least 3 support zones under each foot; these zones should all be stable and on the
same horizontal plane.
(Models 6, 10, 14, 18)
(Models 8, 12, 16, 20)
8

Related product manuals