Page 26 
/TJUUX[TOZ
2OW[OJYOJK
-GYYOJK
)NKIQ\GR\K
56+4
)259+
)NGXMOTM
:]U]G_\GR\K
:NXKK]G_\GR\K
5[ZJUUX[TOZ
5VKT
5VKT
2U
.O
+RKIZXUTOIYIGRK
I_ROTJKX
Procedure:
1.  Tighten the flare nuts of the indoor and outdoor 
units, and confirm that both the 2- and 3-way valves 
are closed.
2.  Slightly connect the Handle Lo charge hose to the 
3-way service port.
3.  Connect the charge hose to the valve at the bottom 
of the cylinder.
  If the refrigerant is R410A, invert the cylinder to 
ensure a complete liquid charge.
4.  Partially open the Handle Lo manifold valve.
5.  Open the valve at the bottom of the cylinder for 5 
seconds to purge the air in the charge hose, then fully 
tighten the  charge hose with the push pin of Handle 
Lo to the gas service port of the 3-way valve.
6.  Place the charging cylinder onto an electronic scale 
and record the starting weight.
7.  Fully open the Handle Lo manifold valve, 2- and 
3-way valves.
8.  Operate the air conditioner in cooling mode and 
charge the system with liquid refrigerant.
9.  When the electronic scale displays the correct weight 
(refer to the gauge and the pressure of the low 
side to confirm), turn off the air conditioner, then 
disconnect the charge hose from the 3-way service 
port immediately..
10.  Mount the caps of  service port and 2- and 3-way 
valves.
11.  Use a torque wrench to tighten the caps to a torque 
of 18N.m.
12.  Check for gas leakage.
Note: 1. Mechanical connectors used indoors shall comply with local regulations. 
          2. When mechanical connectors are reused indoors, sealing parts shall be renewed. When flared joints 
are reused indoors, the flare part shall be re-fabricated.