INSTALLATION MANUAL
Thank you very much for purchasing our air conditioner,
Before using your air conditioner , please read this manual carefully and keep it for future reference.
Caution:The manual is applicable for the cooling&heating and cooling only outdoor unit.The
cooling&heating indoor unit is applicable for the cooling&heating and the cooling only outdoor
unit;the heating capacity of the indoor unit will be effective only when the indoor unit connect
to the cooling&heating outdoor unit.
Quantity setting
dial switch of
indoor units
Constraint
cooling
Query button
Outdoor address
dial switch
Outdoor power
dial switch
X-POWER Full DC Inverter Outdoor Unit
Question and Answer IconNeed help?

Do you have a question about the Carrier S-Series and is the answer not in the manual?

Carrier S-Series Specifications

General IconGeneral
BrandCarrier
ModelS-Series
CategoryInverter
LanguageEnglish

Summary

Precautions for Installation and Safety

Construction Checkpoints and Initial Setup

Refrigerant Pipe Installation

Guidelines for installing refrigerant pipes, including welding and insulation.

Electric Wiring Procedures

Instructions for connecting electrical wiring for the unit.

Outdoor Unit Installation Guide

Selecting Installation Position

Criteria for choosing the optimal location for the outdoor unit.

Refrigerant Pipe System

Refrigerant Piping Length and Drop Height Limits

Permitted lengths and vertical distances for refrigerant pipes.

Gas Tightness Testing Procedure

Steps for performing a gas leak test on the piping.

Vacuum Pump Operation for Piping

How to use a vacuum pump for the piping system.

Refrigerant Amount Calculation

How to determine the amount of refrigerant to add.

Electric Wiring and System Control

Electric Wiring System Installation

Overall guidelines for installing the electrical system.

Outdoor Unit Power Wiring

Specifics on wiring the power supply to the outdoor unit.

Trial Run and Commissioning

Pre-Commissioning Inspection

Checks required before starting the system for the first time.

Preparation Before Debugging

Steps to take before the initial system testing.

Refrigerant Leakage Precautions

Safety measures related to refrigerant leaks.