11
ALL PANELS MUST BE IN PLACE WHEN RIGGING.
TOUS LES CAPOTS DOIVENT ÊTRE EN PLACE AVANT LE LEVAGE
CAUTION - NOTICE TO RIGGERS:
AVERTISSEMENT - REMARQUE À
L’ATTENTION DES MONTEURS
• Hook rigging shackles through holes in base rail, as shown in Detail “A”.
• Use wooden top skid, when rigging, to prevent rigging straps from damaging unit.
• Max weight includes base unit plus shipping pallet plus all available FIOP's which
could be on that size unit.
• "B" dimension is based on base unit plus economizer option only. This
dimension may vary slightly with units configured with other FIOP options.
• Spreader bars required to lift and transport the unit.
• Accrocher les manilles des élingues de levages dans les trous situés dans le rail
de base comme indiqué au Détail “A”.
• Utiliser des cales en bois lors du levage pour éviter que les élingues
n’endommagent le haut de l’appareil.
• Le poids maximum inclut la configuration de base, le poids de la palette
d'expédition, ainsi que toutes les options pouvant être installées en usine (FIOP)
pour la plateforme sélectionnée.
• La dimension de "B" provient de la configuration de base qui inclut l'option
economizer seulement, Cette dimension peut varier légèrement en fonction
des différentes options sélectionnées installées en usine (FIOP).
• Barres d'écartement requises pour soulever et transporter l'unité.
REQUIRED
“C”
“B”
“A”
914-1371
(36"-54")
SPREADER
BARS
SEE DETAIL “A”
VOIR DÉTAIL “A”
PLACE ALL SEAL STRIP IN PLACE
BEFORE PLACING UNIT ON ROOF CURB.
INSTALLER TOUTES LES BANDES
D’ISOLATION EN PLACE AVANT DE
PLACER L’APPAREIL SUR LE REBORD
DE TOIT.
DUCT END
PASSAGES CONDUITES
MAX WEIGHT
LB
1145
1080
KG
520
491
IN
88
88
MM
2235
2235
IN
32
30 3/8
MM
812
772
IN
49 1/2
49 1/2
MM
1257
1257
MODEL
48LC_007
50LC_007
DETAIL A
DÉTAIL “A”
AB
C
48TM504503 REV -
C13094
Fig. 6 -- Rigging Label
Step 7 — Convert to Horizontal and Connect
Ductwork (when required)
Unit is shipped in the vertical duct configuration. Unit
without factory--installed economizer or return air smoke
detector option may be field--converted to horizontal ducted
configuration. To convert to horizontal configuration,
remove screws from side duct opening covers and remove
covers. Using the same screws, install covers on vertical
duct openings with the insulation--side down. Seals around
duct openings must be tight. See Fig. 7.
Field--supplied flanges should be attached to horizontal
duct openings and all ductwork should be secured to the
flanges. Insulate and weatherproof all external ductwork,
joints, and roof or building openings with counter flashing
and mastic in accordance with applicable codes.
Do not cover or obscure visibility to the unit’s informative
data plate when insulating horizontal ductwork.
C06108
Fig. 7 -- Horizontal Conversion Panels
48HC48LC