EasyManua.ls Logo

Carrier 48LC - Accessory Installation; Pre-Start and Start-Up Procedures

Carrier 48LC
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
Step 13 Adjust Factory--Installed Options
Smoke Detectors
Smoke detector(s) will be connected at the Integrated
Staging Control (ISC) board, at terminals marked Smoke
Shutdown”. Remove jumper JMP 3 when ready to
energize unit.
Step 14 Install Accessories
Available field installed accessories include:
Curb
Thru--base connection kit (must be installed before unit
is set on curb)
EconoMi$er X (with control)
Power Exhaust
Outdoor enthalpy sensor
Differential enthalpy sensor
CO
2
sensor
Louvered hail guard
Phase monitor control
Refer to separate installation instructions for information
on installing these accessories.
Pre--Start and Start--Up
This completes the mechanical installation of the unit.
Refer to the unit’s Service Manual for detailed Pre--Start
and Start--Up instructions. Download the latest versions
from HVAC Partners (www.hvacpartners.com).
Copyright 2013 Carrier Corp. D 7310 W. Morris St. D Indianapolis, IN 46231 Edition Date: 10/13
Manufacturer res er ves the right to change, at any time, specifications and designs without notice and without obligations.
C a t a l o g N o : 4 8 L C --- 7 --- 0 2 S I
R e p l a ce s : 4 8 L C --- 7 --- 0 1 S I
48LC

Table of Contents

Related product manuals