EasyManua.ls Logo

CAS BI Series - Sealing and Optional Drawings; Sealing Procedure; Sealing: Open Top Cover; Sealing: Cover CAL Switch

CAS BI Series
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Sealing bolt
Sealing wire
Sealing lead
Sealing plate
SEALING
Perform the sealing as shown in the below figure after the calibration is
completed.
Open the top cover.
Cover CAL switch in the left top of cover with sealing plate and
screw 2 sealing bolt.
Connect the sealing wire as follows and compress the sealing lead.
OPTIONAL DRAWING
60
61
3 5
2.5
4.5
50
50
89
94
WALL MOUNT
FIXED BRACKET
INDICATOR GUDE BRACKET
FIXED BRACKET
26
All manuals and user guides at all-guides.com

Related product manuals