EasyManua.ls Logo

CDVI ATRIUM ADH10 - Installing the Box Lock

CDVI ATRIUM ADH10
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
cdvigroup.com
EN
ADH10
ATRIUM - Schlage Integration Module (Control up to 10 Schlage Door Handles)
INSTALLATION MANUAL
EN
ADH10
ATRIUM - Schlage Integration Module (Control up to 10 Schlage Door Handles)
INSTALLATION MANUAL
Installing the box lock
Installingtheboxlockallowstosecuretheboxfromnon-authorizedaccess.
Ifneededinstalltheboxlockasshown
in the picture (inside view of the door).
1. Removetheboxdoorknock-out.
2. Insertthelockinthehole.
3. Slidethe“U”metalbracketintothelock
groove as shown in the picture to
securethelockinplace.
Alternativelyorcomplementarytotheboxlock,
theboxmaybesecuredbyxingthecoverto
its base using screws.
Howeverthisshouldbedoneonlyoncethe
installation of the full 10-Door Handle Controller
systemiscompleted.
1. Use the 4 screws supplied to secure
the box cover to its base as shown
in the following picture.

Related product manuals