EasyManua.ls Logo

cecotec Conga 1490 - Assembly; Main Brush and Mops Installation; Wet & Dry Tank Installation

cecotec Conga 1490
112 pages
Go to English
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ENGLISH
24
3. ASSEMBLY
3
1
2
Main brush and mops installation
1. Install the main brush into the robot’s main
body.
2. Install the main brush cover.
3. Adjust the mop to the tank’s bottom part
and press with your hand to make sure it is well
attached.
Wet & dry tank installation
4. Open the water-lling opening, ll
the tank with water and close it again
following the arrows on the picture.
5. Completely dry the connecting plates.
6. Introduce the dust tank into the
compartment and lower the handle.
7. Introduce the Wet&dry tank (water and
dust) into the product’s main body.
4
5
6
7

Table of Contents

Related product manuals