15
ENG
integrity has remained during shipping.
Gaskets must be in the proper position or flue
gases could leak resulting in carbon monoxide
poisoning.
1. Align pipes and push them together as far
as they will go (to indent or at least 1.75
inches).
2. Tighten gear clamp to a minimum torque
of 40 in/lbs. and a maximum of 50 in/lbs.
NOTE: Some flue collars may require the use
of high temperature silicone sealant to make
a positive pressure gas tight seal.
Side wall venting installation