EasyManua.ls Logo

CESAB B 215 - Page 221

Default Icon
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-5
2
2
2
3
5
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18
18
18
18
18
Point Operation
[Point 1]
Disassembly:
Remove the components in order to create the
working space
[Point 2]
Disassembly:
Remove the power cables and the wiring of the
encoder sensor.
Screw out the 6 screws of the motor.
Assembly:
After the installation, tightening torque of the 6 fixing
screws of drive motor:
Tightening torque = 79 Nm + Loctite 243
[Point 3]
Disassembly:
Connect a chain or a belt to the motor, as shown on
the picture, by a screw of M8 to the threaded hole on
the motor shaft
[Point 4]
Disassembly:
Lift up the motor and put it in horizontal position or in
vertical position on a special support as shown in the
picture, in order to avoid dangerous movements
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals