EasyManua.ls Logo

CESAB B 215 - Page 233

Default Icon
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-17
2
2
2
3
5
5
6
7
8
9
10
11
12
13
14
15
16
17
18
18
18
18
18
18
Point Operation
[Point 1]
Disassembly:
Disconnect the wirings of the two pedals.
Disconnect the brake hose of the brake pedal by
closing it to avoid the loosing of the brake oil. Remove
the 3 screws per pedal from the front of the frame.
Assembly:
After installation, tightening torque of the pedal bolts =
24 Nm
[Point 2]
Disassembly:
Remove the hydraulic oil tank by removing the 2 bolts
on the frame
[Point 3]
Disassembly:
Disconnect the 3 cables from the pump motor and the
wiring of the encoder sensor
Assembly:
After installation, tightening torque of the cables bolts =
15 Nm
[Point 4]
Disassembly:
Remove the 4 nuts from the fixing brackets of the
pump motor with the frame
Assembly:
After installation, tightening torque of the 4 fixing bolts
= 15 Nm
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals