Reassembly Procedure
The installation procedure is the reverse of the removal procedure.
Notes:
Pay attention to the teethes of the hydraulic motor and potentiometer during the reassembly of
the drive unit
Nots:
Type and quantity of gear oil
Type of grease
Point Operations
[Point 1]
Disassembly:
Lower completely down the mast.
Connect the chain on the showed before removing the
mast.
Disconnect the hydraulic hoses from the mast (lifting,
tilting, side shift, …)
[Point 2]
Disassembly:
Remove the 4 bolts that fix the mast to the frame from
the bottom
Reassembly:
After installation, tightening torque of the 4 screws of
the mast = 83 Nm
[Point 3]
Disassembly:
Remove the 2 screws of the safety plates and then the
2 pins of the tilting cylinders (it is necessary to remove
the mast to avoid the vehicle overturning while lifted up
on the back side)
Reassembly:
After installation, tightening torque of the 2 screws of
the safety plates for the pins of tilting cylinders = 24
Nm
Type
STD Mobilube HD 80 W-90
Cold storage type Mobilube 1SHC 75 W-90
Quantity 6,2 l
STD
Mobiltemp SHC 100
Cold storage type