7-8
REMOVAL • INSTALLATION
Removal procedure
1. Lower the forks to the ground
2. Disconnect the battery plug
3. Remove the footboard
4. Remove the hydraulic oil from the tank
5. Disconnect the hoses from the priority valve
6. Remove the priority valve.
Installation procedure
The reassembly procedure is the reverse of the disassembly procedure.
Remarks:
Replace the o-ring whenever you remove the priority valve
12 Nm (± 15%)
Pressure socket
105 Nm (± 10%)
50 Nm (± 10%)
80 Nm (± 10%)
45 Nm (± 10%)
https://www.forkliftpdfmanuals.com/