11-15
0
1
2
3
4
5
6
7
8
9
11
11
11
14
14
15
16
16
18
Point Operation
[Point 1]
Disassembly:
Straighten the fins
Disassembly:
Slide out the split pin
[Point 2]
Installation:
Comply with the sizing indicated in the figure to the side
(image refers to fixed mast)
Inspection:
Remove the forks and check that the X height complies
with the ISO tables shown in the MAST CHAINS
section; if not, turn the tension rods on the carriage.
Check that there is no interference with the limit switch
when the mast is at maximum height
https://www.forkliftpdfmanuals.com/