EasyManua.ls Logo

CESAB B 215 - SERVICE PUMP DISASSEMBLY • REASSEMBLY

Default Icon
460 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13-4
SERVICE PUMP
DISASSEMBLY • REASSEMBLY
Disassembly Procedure
1. Disconnect the battery plug
2. Remove the foot board
3. Remove the tank cap
4. Drain out the hydraulic oil
5. Disconnect the hoses of the priority valve
6. Disconnect inlet connection of the oil pump (tank - pump) from the connection of the tank
7. Remove the oil pump set bolts of the pump motor
Reassembly Procedure
The reassembly procedure is the reverse of the disassembly procedure.
Tightening torque of the fixing bolts = 45 Nm
Notes:
Before the assemblage, grease the pump-motor coupling. Always before the assemblage, clean
the flange of interface between pump and motor.
12 Nm (± 15%)
Pressure intake
105 Nm (± 10%)
50 Nm (± 10%)
80 Nm (± 10%)
45 Nm (± 10%)
https://www.forkliftpdfmanuals.com/

Table of Contents

Related product manuals