InstallationProduct Manual - Trifecta
®
XPro Series
Purge and Pre-Charge of the Trifecta XPro Series
Cont.
Open the P.B. Isolation valve on the bottom of tank 1 and
tank 2 (V-3)

plug was removed for 10 to 15 seconds.
Close the P.B. Isolation valves on the bottom of tank 1
and tank 2 (V-3).
Note 1 If isolation valves are present in place of

vaporizers are installed, ensure that you
purge through the auxiliary PB vaporizers


from which they were removed.
Open the P.B. Isolation valve on the bottom of tank 1 and
tank 2 (V-3).
Open VENT/PB Isolation valve on the top of tank 1 and

for purging.
Turn the switch on the front of the control box to “MON”
monitor.


factory default settings.
Check your settings (see Operation).
Slowly open the use valve (V-2).