EasyManua.ls Logo

Chevrolet 2012 Volt - Page 402

Chevrolet 2012 Volt
454 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Black plate (6,1)
Chevrolet Volt Owner Manual - 2012
11-6 Service and Maintenance
Footnotes Maintenance
Schedule Additional Required
Services Normal
a) Check all fuel and vapor lines
and hoses for proper hookup,
routing, and condition. Check that
the purge valve, if the vehicle has
one, works properly. Replace as
needed.
b) Or every four years, whichever
comes first.
c) Or every five years, whichever
comes first. See Cooling System
(Engine) on page 1015 or Cooling
System (High Voltage Battery) on
page 1016 or Cooling System
(Power Electronics and Charger
Modules) on page 1017.
d) Or every 10 years, whichever
comes first. Inspect for fraying,
excessive cracking, or damage;
replace, if needed.

Table of Contents

Related product manuals