EasyManua.ls Logo

CircuPool Universal Series - Installation Checklist

CircuPool Universal Series
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
Cell Unions installed and glued into pipe work.
Threaded Collars on either side of the Cell are hand tight.
Flow Switch is installed and oriented properly.
Control Module is affixed to wall and wired correctly.
Cell Cable and Flow Switch are connected to Control Module.
You have checked and confirmed that Control Module switches
ON and OFF concurrently with filter pump, or is energized
continuously for use with variable speed pump.
You have checked all connections and joints for leaks.
Sufficient salt has been added and fully dissolved and circulated
throughout pool water.
Pool has properly balanced water chemistry.
INSTALLATION CHECKLIST

Other manuals for CircuPool Universal Series

Related product manuals