EasyManuals Logo

Cisco 800 Series Hardware Installation Guide

Cisco 800 Series
292 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #166 background imageLoading...
Page #166 background image
2-14
Cisco Integrated Services Router Hardware Installation Guide
Chapter 2 Installing the Router
Installing the Cisco 810 ISR
Step 7 Hold the mounting bracket and insert a 6-32 x 0.18-inch screw into each of the four corresponding holes
(A, B, or C) and tighten.
Step 8 If necessary, drill or cut a cable access hole in the ceiling tile large enough for the Ethernet and power
cables. Pull the cables through the access hole until you have about 1 foot of cable protruding from the
hole.
Step 9 (Optional). Use the ground screw to ground the router to a suitable building ground. See the “Grounding
the Cisco 812 ISR” section on page 2-18 for general grounding instructions.
Step 10 Connect the Ethernet and power cables to the router.
Step 11 Align the router feet over the keyhole mounting slots on the mounting bracket. If you created a hole for
the cables, make sure the router is positioned so that the cables reach their respective ports.
Step 12 Gently slide the router onto the mounting bracket until it clicks into place. Figure 2-14 shows the
Cisco 812 ISR mounted on a T-rail ceiling rail using a ceiling grid clip.

Table of Contents

Other manuals for Cisco 800 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco 800 Series and is the answer not in the manual?

Cisco 800 Series Specifications

General IconGeneral
ModelCisco 800 Series
CategoryNetwork Router
VPN SupportYes
FirewallYes
DimensionsVaries by model
ProcessorVaries by model
MemoryVaries by model
Operating SystemCisco IOS
WAN PortsVaries by model
LAN PortsVaries by model
WAN InterfacesVaries by model
LAN InterfacesFast Ethernet or Gigabit Ethernet

Related product manuals