Prepare for Installation
Before you install the Cisco NCS 540, you must prepare your site for the installation.
Preparing your site involves these tasks:
• General Precautions, on page 1
• Site Planning Checklist, on page 2
• Environmental Requirements, on page 2
• Airflow Guidelines, on page 2
• Site Power Guidelines, on page 6
• Site Cabling Guidelines, on page 7
• Tools and Equipment, on page 8
• Prepare Your Location , on page 9
• Prepare Yourself , on page 9
• Prepare Rack for Router Installation, on page 10
• Cabinet Selection Guidelines, on page 10
• Unpack the Cisco NCS 540 Small Density Router, on page 11
General Precautions
Observe the following general precautions when using and working with your chassis:
• Keep your system components away from radiators and heat sources, and do not block cooling vents.
• Do not spill food or liquids on your system components, and never operate the product in a wet
environment.
• Do not push any objects into the openings of your system components. Doing so can cause fire or electric
shock by shorting out interior components.
• Position system cables and power supply cable carefully. Route system cables and the power supply
cable and plug so that they are not stepped on or tripped over. Ensure that nothing is rests on your system
component cables or power cable.
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
modifications. Always follow your local and national wiring rules.
• If you turn off your system to avoid damage to the system components, wait at least 30 seconds before
turning it on again.
Prepare for Installation
1