EasyManuals Logo

Cisco SGE2000 Administration Guide

Cisco SGE2000
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Chapter
4
45
Chapter 4: Console Configuration
Configuring the Switch through the Console or Telnet Interface
Linksys One Ready Communications Solution
c. Select Save to save your changes.
Network Configuration
The Network Configuration screen offers a choice of two tests, Ping and TraceRoute.
Ping
The Ping screen displays the IP address of the location you want to contact.
Select Edit to change the IP address, and select Execute to begin the ping test.
After the ping test is complete, the Ping screen displays the IP address, status, and
statistics of the ping test.
Select Edit to make changes. When your changes are complete, press the Esc key to
return to the Action menu, and select Save to save your changes.
TraceRoute
The TraceRoute screen displays the IP address of the address whose route you want to
trace.
Select Edit to change the IP address, and select Execute to begin the traceroute test.
After the traceroute test is complete, the TraceRoute screen displays the IP address,
status, and statistics of the traceroute test.

Table of Contents

Other manuals for Cisco SGE2000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco SGE2000 and is the answer not in the manual?

Cisco SGE2000 Specifications

General IconGeneral
Jumbo Frame Support9KB
VLANsUp to 256
ManagementWeb-based, SNMP, CLI
StandardsIEEE 802.3, 802.3u, 802.3ab, 802.3z, 802.3x, 802.1D, 802.1Q, 802.1p, 802.1w
Dimensions440 x 44 x 257 mm
Power Supply100 to 240V AC, 50-60 Hz
Operating Temperature0°C to 40°C
Storage Temperature-20 to 70°C (-4 to 158°F)
Humidity10% to 90% non-condensing
Weight3.2 kg

Related product manuals