EasyManua.ls Logo

CITROEN CX 2000 - Page 151

CITROEN CX 2000
394 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
OPERATION No MA. 173.0 : C/
l<,C ,,,g //JP p/r”/ SuppI) k’
CHECKING THE PETROL PRESSURE USING APPARATUS 4005-T
Install apparatus 4005-T as shown above.
Disconnect reservoir return line from the carburettor and fit plug A on by-pass union ( 1 1.
Unscrew knurled knob B by approximately one and a half turns.
Start the engine
a) Check pressure of petrol at nil output :
b
c
-Fully screw down knurled knob B and read the stabilized pressure on the pressure gouge which should
be 325
mbors ( 47 psi ) maximum.
Check the proper sealing of the pump return valve
-Stop the engine.
There should be no sudden drop in pressure
Check the proper sealing of the carburettor needle valve :
- Unscrew knurled plug B and start the engine. Let it run for a few minutes.
-Stop theengine.
There should be no sudden drop in pressure.
= Remove apportus 4005=T and fit to carburettor the tank supply and return pipes (after having removed plug A 1:
CHECKING THE PUMP FOR LEAKS
- Close the pump return pipe.
-- Blow compressed air under pressure of 800 mbar
( 11.6 psi ) into Suction tube.
Immerse pump in a container filled with clean
petrol.
There should be no sign of dny leak.
Work on petrol gauge sender unit :
To work on the petrol gouge sender unit it is
necessary to drain the tank (drain plug 1, and
~emcwe it. It is held by double strap fixed by
nut (2 1.
Tightening of nut (2) = 15 mN ( 1.; m.kg )
( 10 3/4 ft.lb ).

Related product manuals