1 - BEFORE STARTUP
Your Cleaver-Brooks boiler has been factory fire-tested and the control system pre-configured for a trouble-
free startup. To help ensure a successful lightoff and reliable operation, certain initial conditions should be
observed.
Do not attempt to place the boiler into service without verifying that all connections - fuel, steam and
water piping, electrical connections, stack, and combustion air provisions - have been installed properly
and in accordance with any applicable codes or regulations.
1.1 Operating Conditions
The installation site should be as free as possible from vibration,
dust, and corrosive media
The controllers should be located as far as possible from sources of
electromagnetic fields, such as frequency converters or high-voltage
ignition transformers
Control panel must be connected to earth ground. For electrical
wiring requirements, see wiring diagram provided with the boiler or
in the CFV manual.
Figure 1 CFV Connections
RELIEF VALVE
STEAM
OUTLET
SURFACE
BLOWOFF
GAS SUPPLY
FEEDWATER
BLOWDOWN
STACK
OUTLET
CONDENSATE DRAIN
COMBUSTION AIR INLET
GAUGE GLASS DRAIN
WATER COLUMN DRAIN
!
Warning
When using direct vent
combustion in cold climates,
special care must be taken to
observe combustion air
temperature limits. Failure to
follow this precaution may lead
to equipment damage or unsafe
operation.