M0G940E8-00 04/07/08 pag 14
Install the unit raised off the ground and on a sturdy base. Consider the maximum depth that snowfall might reach.
A
!
2 A
!
!
!
Tree
1
3
2
1. elastic joint
2. floating floor
3. soundproofing
Consider clearances and direction of expelled air.
Keep the coil clean. Avoid
zones with leaves / dirt /
corrosives.
Prevent the transmission of
vibrations.
!
Provide windbreaks in locations with strong winds