EasyManua.ls Logo

Code Blue CB 1 Series - Base Gasket Installation Procedure

Code Blue CB 1 Series
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Code Blue
259 Hedcor Street
Holland, MI 49423 USA
800.205.7186
www.codeblue.com
GU-157-AApage 25 of 76
CB 1 Series
Administrator Guide
3.0 Install the Base Gasket
3.1 Access the mounting studs through the access door on the side of the unit.
3.2 Set the gasket on the bolts and cut a small hole where the conduit is located.
Stretch the screen tightly around the conduit pipe. Slide the gasket over the bolts to the
base of unit.
3.3 Place the second washer on the anchor bolt and place the nut on top.
Tighten the mounting nuts onto the anchor bolts. This may be more convenient
if a long socket, extension and universal joint is used to tighten the hardware.
*For an extra-strong seal, a bead of silicone caulk can be put on the
gasket from bolt hole to bolt hole before setting the gasket into place and
around the conduit.

Table of Contents

Related product manuals