Code Blue
•
259 Hedcor Street
•
Holland, MI 49423 USA
•
800.205.7186
•
www.codeblue.com
GU-157-AApage 8 of 76
CB 1 Series
Administrator Guide
CB 1-e and CB 1-s Tools Required
1. Ladder to reach the top of the units
2. Drill and security bit for removing and inserting security screws on phone, dome top and
access door
3. 11/8 socket set and extension for installing anchor bolts or Deck Mount Kits
4. 3/8 socket set to mount the mounting plate containing the new toroid transformer (PAS only)
5. Phillips head screwdriver and at head screwdriver
6. 1/2-inch wrench for NightCharge
®
batteries, if required
CB 1-s with AED Tools Required
1. Ladder to reach the top of the units
2. Drill and security bit for removing and inserting security screws on phone, dome top and
access door
3. 11/8 socket set and extension for installing anchor bolts
4. Phillips head screwdriver and at head screwdriver
CB 1-w with WindAssist™ Tools Required
1. Ladder to reach the top of the units
2. Drill and security bit for removing and inserting security screws on phone, dome top and
access door
3. 11/8 socket set and extension for installing anchor bolts
4. Phillips head screwdriver and at head screwdriver
5. 1/2-inch wrench for solar batteries