User’s manual
Version: 5
Page: 22 of 26
Date: 09.11.2022
INSTRUCTION – UNPACKING AND PREPARATIONS BEFORE INSTALLATION
Your new pelletizer has been assembled as one unit. In order to avoid damages during transport, the pelletizer has been
bolted onto the transport pallet.
Unpacking and Examination for Transport Damages
1. Examine the transport box for any damages occurred during transportation.
2. Remove the straps that secure the transport box to the pallet.
3. Remove the top and side plates from the transport box.
4. Remove the straps that secure the PR120H to the pallet.
5. Unbolt the 4 bolts that secure the PR120H to the pallet.
6. Examine the PR120H for external transport damages.
7. Open the cabinet door at the control panel and examine the PR120H for internal transport damages.
Requirements on the Environment Surrounding the PR120H
o The PR120H must be sheltered from wind and weather.
o The ambient temperature must be minimum +5°C (+41°F).
How to Lift / Transport the PR120H
Cold Jet PR120H: Drawing no. A1
o The Cold Jet PR120H is supplied with thread holes for lifting eyes. Always use lifting eyes to lift the pelletizer.
o Always lift the PR120H according to the lifting instruction in this manual.
o Lifting over persons and animals is prohibited.
o Always use a forklift truck to transport the PR120H.
o Pick up the PR120H from the side as shown in the drawings.
o Transport the PR120H upright.
o Make sure that the forks are sufficiently long to fully engage the PR120H.
o Always check that the forks are adjusted to maximum width.
PR120H:
Minimum load capacity of forklift truck: 800 kg /1764 lbs
Minimum fork length: 0.8 m
Floor Characteristics and Minimum Clear Distances
Cold Jet PR120H: Drawing no. A2
o The PR120H must be placed on a horizontal concrete floor with an adequate load-carrying capacity, free from crack
formation and suitable for bolting the PR120H to it.
o The minimum clear distances must be observed to provide sufficient space for opening the cabinet doors and servicing
the PR120H.
Installation of the PR120H
The installation of the PR120H must be carried out by one of Cold Jet’s service technician, or by a technician approved by
Cold Jet.