Pre-Installation Guidelines & Checklist
1
Introduction
Before any pelletizer can be installed, the owner/operator must prepare the site for installation
and operation. It is the owner’s responsibility to verify all the necessary preparations have
been made to the installation site and meet the specications and guidelines detailed in this
publication. This may include but is not limited to:
y Providing an indoor space with standard industrial ooring.
y Installing a liquid CO
2
tank and supply pipeline system up to the connection point at the
pelletizer.
y Installing a gaseous CO
2
exhaust pipeline from the pelletizer to free vent at a safe
position.
y Installing a power supply that is sucient and up to code.
y Providing proper room ventilation and other CO
2
safety measures.
y Determine which options and other manufacturing accessories to add/prepare for
maximizing production performance and capabilities.
The owner is responsible for transmitting the specications in this publication to other third-
party contractors involved in the pre-installation preparations of the site. Failure to properly
prepare the site may delay the installation and/or optimal performance of the pelletizer.
The graphics used in this manual may show pelletizer details and installation components
that may be dierent than what is actually used. Components may have been removed for
illustrative purposes or the continuing improvement of the pelletizer’s design may cause
changes that are not included in this publication.