EasyManua.ls Logo

COLDTUB Icekube - Startup Procedures

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Winning is cool™
1.5 Installation Instructions
SITE PREPARATION
Make sure you ensure the following:
Always put your tub on a structurally sound, LEVEL surface. A lled tub can weigh a great deal.
Make certain that the location you choose can support the weight of your lled tub.
Position equipment compartment which houses all of the electrical components in a place where
your will have easy access for periodic tub care and maintenance.
Allow adequate access to all other access panels for service.
OUTDOOR GROUND LEVEL INSTALLATION
No matter where you install your new tub, it’s important that you have a solid foundation for support.
If using patio stones, they should be at least two inches thick and twelve inches square. Even with
stones in place, the tub will possibly settle and become uneven, and may require re-leveling over
time.
Deck Installation
To be certain your deck can support your tub, you must know the deck’s maximum load capacity.
Consult a qualied building contractor or structural engineer. To nd your tub refer to the Tub
Specication chart. This weight per square foot must not exceed the structure’s rated capacity, or
serious structural damage could result.
WARNING!
We recommend that the COLDTUB™
be installed above ground. Consult a
licensed building contractor to design
or evaluate your custom decking
requirements.
4

Table of Contents