engine reaching of it's operational temperature smoothly. The warming period is 
finished either when the temperature reaches the warming level or if duration of 
the warming period reaches Max warm time. 
 
Setpoint: Warming temp 
This setpoint adjusts the warming temperature. The warming phase is finished 
when either the water temperature at the logical analog input Warming temp 
reaches this level or the Max warm time elapses. 
NOTE:  
See also the setpoint Warming load.  
 
 
Setpoint: Max warm time 
This setpoint adjusts the maximum duration of the warming phase after the genset 
was sychchronized to the mains. The warming phase is finished when either the 
water temperature at the logical analog input Warming Temp reaches this level or 
the Max warm time elapses. 
 
Setpoint: Cooling speed 
This setpoint is used to select whether the cooling phase is performed at idle or 
nominal speed, i.e. whether the output Idle/Nominal is open or closed during the 
idle phase. 
 
Gen-set performs cooling at nominal speed, generator voltage 
and frequency protections remain active during cooling phase. 
Gen-set performs cooling at idle speed, generator protections 
are not active in the cooling phase (except of Gen >V Sd).