EasyManua.ls Logo

COTLIN LB Series - Page 13

Default Icon
21 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
安全提示
No.JT190100017 Version No.A0
Note: The subsequent versions of this manual are subject to change without notice, thank you
13 / 21
Cleaning And Disinfection
cleaning stops and starts to drain.
Drainage is completed after 30s;
Enter the automatic rinsing phase, first clean
for 3 minutes, then drain for 30 seconds. After
the rinsing process is recirculated 5 times, the
entire cleaning process ends and the screen
displays "OFF".
Enter the standby state, the whole process takes
about 37 minutes;
4. Unplug the power plug
5. Remove the water pipe, water baffle, take out
the water pump, float ball, ice shovel (refer
to the parts removal/installation process for
the removal method)
6. Mix 8L heating water (45~50℃) and 4
packages of cleaning agent (KAY DELIMER,
56.7g/package) into a cleaning solution (the
amount of cleaning solution needs to be
adjusted appropriately for the amount of
cleaning parts).
7. Soak the parts in the cleaning solution for
more than 5 minutes (in the case of heavy scale,
it is recommended to soak for more than 10
minutes).
8. While soaking the parts, use a nylon
brush or soft cloth dipped in cleaning fluid
to wipe the surface of the parts that are in
contact with water and ice, such as evaporator
ice trays, ice shields, ice storage buckets,
etc. The damp cloth wrapped disposable
chopsticks to clean up). Then rinse with clean
water (rinse 5 times).
Scrubbing the ice guard
Scrubbing the ice bin
Brush the water pipe core rod

Related product manuals