EasyManua.ls Logo

CPS FA1000 SERIES - Page 14

CPS FA1000 SERIES
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TIME REMAIN-
ING
00:00:00
QUIT >
EVACUATION IN PROGRESS
Once
DRAINING OIL
is complete, the unit will pro-
ceed to
Evacuation.
The vacuum pump will run
until the
TIME REMAINING
reaches
00:00.
The LCD will now read:
TIME REMAINING
00:02:00
PLEASE WAIT
SKIP >
LEAK CHECK IN PROGRESS
The unit will proceed to a 2:00 minute leak check test.
The LCD will now read:
Note: If leak check fails, check A/C system for leaks.
The FULL CYCLE process will be aborted.
IF REQUIRED
INJECT OIL AT
THIS TIME
CONTINUE >
QUIT >
Once the
LEAK CHECK
has passed or the
SKIP
key is pushed,
The LCD will read:
For model FA1000/FA1000B, use the 481500 Oil/Dye injector kit
to inject oil into the mobile A/C system. For all other models, use
the integrated oil injection bottle to add oil into the mbobile A/C
system.
CHARGING
CHARGE SELCTED
2.00 LBS
CHARGE DISPENSED
0.00 LBS
QUIT >
The LCD will now read:
The CHARGE DISPENSED reading will begin to increase.
Note: If the unit does not completely dispense the charge
into the A/C system, the LCD will notify the user of
options to complete the charge.
OPERATING INSTRUCTIONS FOR THE FA1000
14
Once the CHARGE DISPENSED equals the CHARGE.
The LCD will read: Close HIGH SIDE COUPLER.
Push
CONTINUE
key.
CLOSE HIGH SIDE COUPLER
CONTINUE >

Related product manuals