EasyManua.ls Logo

CPS G-250XTP - Maintenance, Transporting & Storage; Machine Maintenance Schedule; Transporting and Storage Guidelines

CPS G-250XTP
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transporting the Machine
Place the handle in the upright
position.
Lock the handle pin.
Tip the machine back and
transport on the wheels.
Storage
Store inside in dry conditions
to prevent damage to your G-
250X T P.
Maintenance
The G-250XTP has been designed to be low maintenance for the
operator. As such, there are only a few things you need to do to
ensure optimum function.
Warning! Shut down before performing maintenance. Make
sure that the machine is completely stopped and the engine is o
before you begin your clean-up and maintenance procedures.
1. After the machines initial run (8-10 hours), check to ensure belt
tension is correct. If you have performed the initial check, you need
only check the belt every 100 hours thereafter.
2. Be sure to follow all maintenance recommendations for the
Kawasaki engine in the back of this manual.
3. Regrease the ring gear every 300 hours as referenced in the
back of this manual.
By following the schedule above you can expect the G-250XTP to
operate as designed and perform consistently in the eld.
CAUTION! Always place
hands in center of handlebars (see
picture) when lowering and raising
machine! This method increases
stability and reduces the risk of
machine tilting as its re-positioned.
*
*
MAINTENANCE, TRANSPORTING & STORAGE
24/7 Technical Support- Toll Free 1-877-472-8200
19
Concrete Polishing Solutions- G-250XTP Operators Manual