Unigen Plus & Industrial Unigen - User technical documentation
A51Z090004
-D page 18/19
Voltage setting :
Adjust AVR Offset RV11 & Gain RV112 full CCW on the Unigen.
Connect AVR outputs (terminals 20/21) to AVR.
Adjust voltage offset RV11 to have 400VAC.
Close ‘SYNC IN’ input (Terminal 3 to 0 volts).
Adjust AVR Gain RV12 to reach 370VAC.
Check the control of the breaker on dead bus
Be sure there is no critical load connected on bus bar.
Close the breaker and verify that the breaker feedback (terminal 5) is closed (the ‘BREAKER IN’ led
should lit).
Open the breaker and verify that the breaker feedback (terminal 5) is opened (led doesn’t lit).
Adjustment of the nominal power
For the Industrial Unigen :
Set the kW monitor output in 0-5V: ‘sw4’ on OFF position.
Put in full CW the multi turn potentiometer ‘adjust’ RV7.
Close the circuit breaker of the generator. The ‘BREAKER IN’ led must light (terminal 5).
Apply 100% of load on the generating set (with bench load for example).
Adjust ‘NOMINAL kWpotentiometer RV13 to reach 7.45VDC between terminals 11(+) and 12(-) of
the Unigen.
Open the circuit breaker of the generator.
Set the good configuration of ‘sw4’ as desired.
For the Unigen Plus:
Put the ‘sw3’ on OFF position.
Paralleling lines are not connected on terminals 44 and 45.
Close the circuit breaker of the generator. The ‘BREAKER IN’ led must light (terminal 5).
Apply 100% of load on the generating set (with bench load for example).
Adjust ‘NOMINAL kW’ potentiometer RV13 to obtain 3V on parallel lines (terminal 44 & 45).
Open the circuit breaker of the generator.
Check wiring of current
Put load.
Measure the voltage between terminals 11 and 12.
Shunt the phase 1 current directly of the secondary of the current transformer (CT).
Measure the voltage between terminals 11 and 12. Check that this voltage decrease of 1/3 that
before.
Do the same test for phases 2 and 3 (don’t forget to remove the shunt of each phase after test).
Set the good configuration of ‘sw3’ as desired.
Check synchronization
Close the breaker to have voltage on the bus bar (mains or other generator).
Lock the engine breaker in open position.
Start the engine to check the synchronization.
Close ‘SYNC IN’ input (terminal 3 to 0VDC).
Adjust the P (RV15) & I (RV1) potentiometer of synchronization to have a response time of 4 or 5
seconds to get the ‘SYNC OK’ signal (terminals 34/35) the relay closes.
With a voltmeter check on both sides of the breaker if the voltage is <20VAC on each phases.
With the voltmeter check also that there is 400VAC between phase 1 of the engine and phase 2 of the
bus bar (crossed monitoring).
In this test we don’t close the breaker.
If the test is OK, connect the wires of the relay ‘SYNC OK’ (terminals 34/35) of the Unigen.
Load sharing / kW regulation
Regarding the application check the stability of KW and kVAR regulation.
Stop engines.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the CRE Technology UNIGEN Plus and is the answer not in the manual?

CRE Technology UNIGEN Plus Specifications

General IconGeneral
BrandCRE Technology
ModelUNIGEN Plus
CategoryControl Unit
LanguageEnglish

Related product manuals