EasyManua.ls Logo

Crystal Instruments Coco-80 - Uploading Data to Coco

Default Icon
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CoCo-80 Quick Reference
31
example, a new area in Factory1 has been prepared and is
ready to be monitored on a regular basis and includes a
new Machine, Machine2. In this case it is best to use the
Combine Mode during the Upload process. EDM will
upload all new data, but leave any existing Machines,
Points, Routes, etc. untouched.
Uploading Data to CoCo
When all Factories, Machines, Points, Entries, and Routes
have been defined in a Database it is ready to upload to
the CoCo. The backup options in the Database
Management should also be checked to be sure that the
database is saved to the PC.
Select Upload on the toolbar to start the upload process.
Select which databases will be uploaded to the CoCo.
More than one Factory or database can be uploaded to
the CoCo so they are available to the operator.
Figure 30: VDC Synchronization Wizard
Select the Routes to be uploaded and specify whether
existing Routes on the CoCo will be replaced or updated.

Other manuals for Crystal Instruments Coco-80

Related product manuals