10 Cyclone Canopy Installation - English
Measure Installation Height
Determinetherequireddistancebetweentheceilingandthetopof
theblowerbox(D)baseduponceilingheight(C),desiredheightof
hoodabovecooktop(A)andunitheight(B):
D=C-A-B
e height D is the installation height of the mounting bracket
(Figure3).IftheinstallationheightDislessthan22”,themounting
bracketandductcoversmayneedtobecut.eductcoversneedsa
cleancutandmusttobecutfrombottomendsidesforbothinside
andoutsidepieces.Foroptimalclearance,theminimummounting
shouldbe30”abovethecookingsurface.
C/L
A
C
D
B
Blower Top Box
Range Hood Bottom
• When building framework, always follow all applicable
constructioncodesandstandards.
WARNING
Install Mounting Bracket
1. Modify ceiling structure at hood location. Install 2 × 4
crossframingbetweenceilingjoistsusingceilingmounting
bracketdimension(Figure4).eframeworkmustbesized
tosupportthetotalweightofthehood.
2. Finish ceiling surface. Be sure to mark the location of the
ceilingjoistsandcrossframing.Bringhousewiringthrough
nishedceiling.
10 ½”
11 ¼”
9 ⅝”
8 ¾”
ø 6 ¾”
3 ⅜”
1 ⅜”
Upper Mounting
Bracket
Ceiling Joists
Cross Framing
6” Round
Ductwork
ISlanD HooD InStallatIon
• Atleasttwoinstallersarerequiredduetotheweightand
sizeofthehood.
• ishoodshouldbeinstalledtoanishedceiling.
• Turnopowercircuitattheservicepanelbeforewiring
thisunit.
• Allelectricalworkmustbedonebyaqualiedelectrician
in accordance with all applicable codes and standards.
israngehoodmustbeproperlygrounded.
CAUTION
Figure4.
Figure5.