Measurement of the Cylinder Liner Bore
Measure the bore from which is measured
location
(1) to direction of the crank shaft (3) and
counter direction (2).
Measured location: from the top of liner to
bottom 20 mm.
(Max. ware part)
Replace the cylinder liner if the measured
value escaped from specified limit.
CAUTION
Inside of dry type cyliner
liner was electroplated with
chromium.
No honing and boring.
Scarred or damaged inside liner must replace it.
The casted liner is specially procedured honing without the plating
with chromium inside, so that why ring, plated with chromium ring
(Top ring and oil ring) must be used it.(importance)
Inspection of the Cylinder Liner Projection
1) Set up the straight measure (1) at the top
part of liner.
2)
Measure liner projection with the feeler gauge (2).
Inequality liner projection to other clylinder
must be less than 0.3mm.
Replacement of the Cylinder Liner
<Removal of Cylinder Liner>
1) Set up remover of the cylidner liner to cyliner
liner.
2) Check whether surely set up remover of the
cylinder liner at bottom of cylinder liner or
not.
EJM2067I
EJM2068I
EJM2069S
EJM2070S
2.3.9. Cylinder Block and Liner
Standard Limit
Diameter of Cylinder Liner Bore
102.021-102.060 mm
102.20 mm
Limit
Projection of cylinder Liner 0.03-0.10 mm
Remover