9 | Electrical installation
Installer reference guide
125
EPRA08~12EAV3+W1 + ETVH12SU18+23EA6V
Daikin Altherma 3 H MT F
4P644482-1 – 2021.03
a Installation of EKRP1HBAA is required.
b Prewiring between X2M/7+9 and Q1L (=thermal protector backup heater). Do NOT
change.
3 Fix the cable with cable ties to the cable tie mountings.
9.3.7 To connect the space cooling/heating ON/OFF output
Wires: (2+1)×0.75mm²
Maximum load: 0.3A, 250VAC
—
1 Open the following (see "7.2.5To open the indoor unit"[469]):
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the space cooling/heating ON/OFF output cable to the appropriate
terminals as shown in the illustration below.
1+2 Wires connected to the space
cooling/heating ON/OFF output
3 Wire between X2M and A4P
A4P Installation of EKRP1HBAA is
required.