9 | Electrical installation
Installer reference guide
116
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
4P620241-1 – 2020.06
a Installation of EKRP1HBAA is required.
3 Fix the cable with cable ties to the cable tie mountings.
9.2.12 To connect the power consumption digital inputs
Wires: 2 (per input signal)×0.75mm²
Power limitation digital inputs: 12VDC / 12mA detection (voltage
supplied by PCB)
[9.9] Power consumption control.
1 Open the service cover. See "To open the outdoor unit"[472].
2 Connect the power consumption digital inputs cable to the appropriate
terminals as shown in the illustration below.
S6S (DI4)
A8P.1
A8P.2
A8P.3
A8P.4
A8P.5
S7S (DI3)
S8S (DI2)
S9S (DI1)
a Installation of EKRP1AHTA is required.
3 Fix the cable with cable ties to the cable tie mountings.