EasyManua.ls Logo

Daikin Altherma 3 M - About Electrical Compliance; About Preferential Kwh Rate Power Supply

Daikin Altherma 3 M
280 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 | Electrical installation
Installer reference guide
89
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
4P620241-1 – 2020.06
Wire type Installation method
Stranded conductor wire
with round crimp-style
terminal
c b ba c
a
B
B
a Terminal
b Screw
c Flat washer
Allowed
NOT allowed
Tightening torques
Item Tightening torque (N•m)
X1M 2.45 ±10%
X2M 0.88 ±10%
X3M 0.88 ±10%
X4M 2.45 ±10%
X5M 0.88 ±10%
X9M 2.45 ±10%
X10M 0.88 ±10%
9.1.3 About electrical compliance
Only for EBLA09~16DAV3, EBLA09~16DA3V3, EDLA09~16DAV3 and
EDLA09~16DA3V3
Equipment complying with EN/IEC 61000‑3‑12 (European/International Technical
Standard setting the limits for harmonic currents produced by equipment
connected to public low-voltage systems with input current >16A and ≤75A per
phase.).
9.1.4 About preferential kWh rate power supply
Electricity companies throughout the world work hard to provide reliable electric
service at competitive prices and are often authorized to bill clients at benefit
rates. E.g. time-of-use rates, seasonal rates, Wärmepumpentarif in Germany and
Austria, ...
This equipment allows for connection to such preferential kWh rate power supply
delivery systems.
Consult with the electricity company acting as provider at the site where this
equipment is to be installed to know whether it is appropriate to connect the
equipment in one of the preferential kWh rate power supply delivery systems
available, if any.
When the equipment is connected to such preferential kWh rate power supply, the
electricity company is allowed to:
interrupt power supply to the equipment for certain periods of time;

Table of Contents

Other manuals for Daikin Altherma 3 M

Related product manuals