EasyManua.ls Logo

Daikin ERRQ 016AAY1 - Turn Power on

Daikin ERRQ 016AAY1
262 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ESIE09-08 Test Operation
Test Operation 73
1.1.2 Turn Power On
Turn outdoor unit power on.
Turn indoor unit p ower on.
(V3056)
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Close outside panels of the outdoor unit.
Wait until initialization period is over (up to 12 min).
(Can be known by checking leds on outdoor PCB - see “Field
Settings from Outdoor unit” for details.
Car ry out the test run as
desc ribed in the installation
manual of the indoor unit
Carry out field setting, if
necessary

Table of Contents

Related product manuals